A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
您可能感興趣的試卷
你可能感興趣的試題
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
最新試題
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
The bottom of the mast rests on a part of the keel called the mast().
The conclusion is()the said ship is fit to continue to sail.
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
The document on a vessel,annually endorsed by an American Bureau of Shipping surveyor,is called the().
Please arrange the survey()early.
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().