A.bow and stern lines
B.breast lines
C.halyards
D.warps
您可能感興趣的試卷
你可能感興趣的試題
A.pin
B.stem
C.box
D.stand
A.Certificate of Inspection
B.Classification Certificate
C.Load Line Certificate
D.Seaworthy Certificate
A.it
B.this
C.that
D.what
A.approves
B.alleges
C.allows
D.permits
A.foot
B.heel
C.step
D.sole
最新試題
Cracks may be prevented from developing at the corners of welded plating inserts by().
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
The angle between the flukes and the shank of an anchor is called the().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
The end of the joint with the exterior threads is called the().
Please arrange()a surveyor to inspect the damaged bulkhead.
At()an occasional survey has been carried out.
Please arrange the survey()early.
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().