A.visual examinations
B.magnetic particle inspection
C.dye penetrant inspection
D.x-ray inspection
您可能感興趣的試卷
你可能感興趣的試題
A.anchor chain
B.wire rope
C.connecting links
D.pendant wires
A.Operations Manual is approved
B.Minerals Management Service approval is issued
C.classification society approval is issued
D.permanent Certificate of Inspection is issued
A.an unprotected drop-light bulb
B.careless disposal or storage of material
C.smoking in bed
D.worn electrical wires on power tools
A.for 1 year
B.for 2 years
C.until the next Coast Guard inspection
D.until the vessel's Certificate of Inspection expires
A.the ship has been named
B.the ship has been built
C.the ship has been signed
D.the ship has been registered
最新試題
The dangerous semicircle of a hurricane in the Northern Hemisphere is that area of the storm ().
Which channel and mode should be used when initiating a distress alert transmission().
The consistent winds blowing from the horse latitudes to the doldrums are called the().
Which statement about radio navigational warnings is TRUE().
The disadvantage of using a heaving line to pass a towline is that().
The datum from which the predicted heights of tides are reckoned in the tide tables is().
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible? ()
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible? ()
The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the().
What does the DSC control unit do if the GMDSS radio operator fails to insert updated information when initiating a DSC distress alert().