A.Peak value
B.Root-mean-square value
C.Average value
D.Maximum value
您可能感興趣的試卷
你可能感興趣的試題
A.time-delay protection
B.short-circuit protection
C.short duration surge protection
D.sustained overload protection
A.a magnetic operating coil
B.normally open line contacts
C.thermal-overload protection
D.a momentary-contact start button
A.60
B.120
C.180
D.360
A.copper and antimony
B.steel and babbitt
C.aluminum or beryllium alloy
D.zinc or an alloy of tin and lead
A.prevent grounds in branch circuits
B.prevent opens in motor circuits
C.permit momentary overloads without melting
D.guard lighting and electronic circuits
最新試題
To proceed to the assistance of a ship in distress is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the following items don’t belong to dock repair works?()
() is not installed on the main switchboar.
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Using a file without a handle may result in ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish