A.Frequency meter
B.Ammeter
C.Voltmeter
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.thousandth (10 to the-3rd power)
B.millionth (10 to the-6th power)
C.billionth (10 to the-9th power)
D.trillionth (10 to the-12th power)
A.Current and voltage may be in phase
B.Current may lead the voltage
C.Current may lag the voltage
D.All of the above
A.directly as its length and inversely as its cross-sectional area
B.inversely as its length and directly as its cross-sectional area
C.directly as its length and directly as its cross-sectional area
D.inversely as its length and inversely as its cross-sectional area
A.Frequency meter
B.Ohmmeter
C.Induction voltage regulator
D.Current transformer governor
A.bridge control panel
B.disconnect links
C.governor relay box
D.main switchboard
最新試題
The main purpose of port State control is not to()
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Flame failure in an automatically fired auxiliary boiler can from a/an ()
() is not installed on the main switchboar.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()