A.A load on top system
B.Direct line system
C.Circle line system
D.An inert gas system
您可能感興趣的試卷
你可能感興趣的試題
A.Evaporation
B.Dispersion
C.Emulsification
D.Drifting
A.Emulsification
B.Sedimentation / Sinking
C.Oxidation including photooxidation
D.Burning organized by RCC
A.Biodegradation
B.Dissolution
C.Cleaning up by crew with skimmers
D.Oxidation including photooxidation
A.The grades of cargo that an oil tanker is permitted to carry
B.A checklist of the equipment installed for controlling the discharge of oil
C.The trade routes upon which the vessel may operate
D.A list of the underwriters who will assume financial responsibility in the event of an oil spill
A.engaged in the coastwise trade
B.going foreign
C.calling at ports in another country signatory to MARPOL 73/78
D.carrying cargoes listed in the MARPOL regulations
最新試題
The purpose of inert gas systems aboard tankers is to().
Upon arrival at the discharging port,the inert gas system is().
Sour crude oil().
Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall()the system in accordance with the requirements of that Regulation.
Regulations require that tankers handling grade B liquids shall have their cargo pumps separated from all sources of vapor ignition by().
According to the Chemical Data Guide,which reactive group(s) is/are not compatible with the products polybutene and o-xylene? ()
What action must be taken when an individual cargo tank is closed off from the inert gas system by the tank isolation valve?()
The purpose of the deck seal in an inert gas system is to prevent().
The designations A,B,C,D and E grades of cargo refer to the().
Each inert gas system gas main must have an automatic shut down valve at the outlet of the gas production plant. This valve must close automatically upon().