A.the vessel has enough room to swing while at anchor
B.the anchor flukes bite into the ocean bottom
C.there is sufficient weight from the anchor and chain to prevent dragging
D.there is more chain out than there is in the chain locker
您可能感興趣的試卷
你可能感興趣的試題
A.mooring line made of spring lay wire rope
B.mooring line running diagonally to the keel
C.mooring line parallel to the keel
D.wire rope used for securing an anchor buoy
A.Spring lay
B.Lang lay
C.Cable lay
D.Alternate lay
A.independent
B.lang lay
C.preformed
D.spring lay
A.clean anchor chain as it's hauled in
B.recover anchors which have lost their buoys
C.run and retrieve anchors
D.prepare anchor chain for inspection
A.can be released while under strain
B.is used for boat falls
C.is used for extra heavy loads
D.is used for light loads only
最新試題
The freight will not be payable()the goods are delivered in such a condition that they are substantially and in a mercantile sense the same goods as those shipped.
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().
In the stowage of deck cargo,cribbing is().
A wire rope that has been overstrained will show().
Limber is a term associated with().
Progressive flooding is controlled by securing watertight boundaries and().
Please tell the stevedores to load the cargo()according to the respective figures.
A tool consisting of a handle and releasable chain used for turning pipe or fittings of a diameter larger than that which a pipe wrench would fit is called().
If two mooring lines are to be placed on the same bollard,which method is BEST?().
The lashings of a stack of containers with interlocking fittings restrain the forces that cause().