A.emergency gear
B.drainage
C.deck cargo storage
D.securing gear
您可能感興趣的試卷
你可能感興趣的試題
A.IN
B.ON
C.AT
D.FOR
A.placed on deck to support the cargo
B.separation pieces used to keep cylinders upright and steady
C.shims for stowing baled cargo
D.nets placed across the hatch opening to keep the cargo from falling in the hatch
A.dried,and stowed in a place with adequate ventilation
B.stowed in a hot,moist compartment
C.stowed on deck at all times
D.stowed in any compartment
A.pull the tagged end from the top of the coil
B.pull the tagged end through the eye of the coil
C.secure the outside end and unroll the coil
D.unreel the coil from a spool
A.move port-side main-deck cargo to the starboard side
B.fill the starboard double-bottom
C.pump water from the port double-bottom to the starboard double-bottom
D.pump water from the port double-bottom over the side
最新試題
Nylon line is better suited than manila for().
If two mooring lines are to be placed on the same bollard,which method is BEST?().
The shippers to load trucks and heavy cargo,and also to supply all necessary materials for lashing.The expenses will be charged to()account.
How is the size of chain determined?().
If the goods shipped are perishable,low cost goods,live animals,deck cargo,etc.,the freight and all related charges shall be paid().
In the stowage of deck cargo,cribbing is().
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
All the following except()are fittings for securing and lashing containers on board ships.
A sufficient amount of chain must be veered when anchoring a vessel to ensure().
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().