單項(xiàng)選擇題The Company should establish in the SMS that () has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.

A.the master
B.the chief engineer
C.the officer on duty
D.the engineer in charge of watch


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The SMS should provide for specific measures aimed at promoting the reliability of equipment or systems () may result in hazardous situations.

A.which the sudden operational failure
B.that the sudden operational failure
C.the sudden operational failure
D.the sudden operational failure of which

2.單項(xiàng)選擇題() should not undertake any task which will interfere with the supervision duties relating to the main machinery and associated equipment.

A.The watch keeping personnel
B.The chief engineer
C.The person on a bunker barge
D.The duty deck officer

3.單項(xiàng)選擇題STCW78/95 Convention describes that () are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.

A.available minimum requirements
B.available maximum requirements
C.mandatory minimum requirements
D.mandatory maximum requirements

4.單項(xiàng)選擇題In some cases facilities may be provided for emergency overriding oil pressure shutdown, if this facility is used, adequate warning must be given to ().

A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff

5.單項(xiàng)選擇題At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.

A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate

最新試題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:?jiǎn)雾?xiàng)選擇題

Diesel engine air start system check valves are opened by ()

題型:?jiǎn)雾?xiàng)選擇題

Cold weather starting of a diesel engine may be made easier by()

題型:?jiǎn)雾?xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:?jiǎn)雾?xiàng)選擇題

Which of the following items don’t belong to dock repair works?()

題型:?jiǎn)雾?xiàng)選擇題

Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()

題型:?jiǎn)雾?xiàng)選擇題