A.liquid strainer
B.liquid receiver
C.saltwater condenser
D.evaporator
您可能感興趣的試卷
你可能感興趣的試題
A.SEA WORTHINESS
B.SEA TRIALS
C.TRIAL-AND-ERROR
D.DOCK TRIALS
A.REEFER
B.RO/RO SHIP
C.CONTAINER
D.TANKER
A.SEA CHEST
B.SCUPPER
C.SCUTTLE
D.SEA PORT
A.Power factor
B.Power ratio
C.compression ratio
D.Compression factor
A.should agitate
B.should not agitate
C.should mix up
D.should not add up
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The shipboard oil pollution emergency plan will be invalid after ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Using a file without a handle may result in ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.