A.Care to be not taken
B.Care not to be taken
C.Care to be taken not
D.Not care to be taken
您可能感興趣的試卷
你可能感興趣的試題
A.claim to
B.claiming to
C.claim for
D.claiming for
A.Heats
B.Heating
C.To heat
D.Heated
A.not to go against
B.don’t go against
C.not go to against
D.to not go against
A.To work
B.Working
C.Having worked
D.worked
A.to discharge
B.to be discharged
C.discharging
D.being discharged
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
() is not installed on the main switchboar.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
To proceed to the assistance of a ship in distress is()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The treatment of the fuel oils involves storage, heating, filtering and()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The condensers located in various stages of a flash evaporator are cooled by()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()