單項選擇題Our company has built a new ship in Hamburg and I am going to fly there to ().

A.hand it over
B.take it over
C.carry it over
D.carry it out


您可能感興趣的試卷

你可能感興趣的試題

2.單項選擇題I am sorry () waiting for a long time.

A.to keeping you
B.to kept you
C.to have kept you
D.kept you

3.單項選擇題By this time tomorrow, the ship ()its repair work in the engine room.

A.will do
B.has done
C.had done
D.will have done

4.單項選擇題I would have gone ashore with the second engineer, if I () time.

A.have had
B.had have
C.had had
D.would have had

5.單項選擇題Please give us your quotations ()you receive the additional repair list.

A.as soon as
B.as well as
C.as soon as possible
D.as early as possible

最新試題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:單項選擇題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:單項選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項選擇題

Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()

題型:單項選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:單項選擇題

The main purpose of port State control is not to()

題型:單項選擇題

Using a file without a handle may result in ()

題型:單項選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:單項選擇題

Which of the following items don’t belong to dock repair works?()

題型:單項選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:單項選擇題