A.it is difficult for them to finish the job in time
B.difficult for them to finish the job in time
C.they have much difficulty to finish the job in time
D.that difficult for them to finish the job in time
您可能感興趣的試卷
你可能感興趣的試題
A.the third engineer
B.the PSCO
C.the surveyor
D.the chief engineer
A.missing valve hand wheels
B.dirty tank tops
C.a large number of temporary repairs
D.All of the above
A.the manager of the company
B.the surveyor of the Classification Society
C.the master of the vessel
D.the chief engineer of the vessel
A.the survival craft launching equipment have never been used
B.the pivot points are seized
C.the lashing or stowing of deck cargo is improper
D.All of the above signs are evident
A.The quantity of oil residues generated
B.The capacity of sludge and bilge water holding tank
C.The capacity of the oily water separator
D.All of the above
最新試題
Diesel engine air start system check valves are opened by ()
() is not installed on the main switchboar.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Cold weather starting of a diesel engine may be made easier by()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Using a file without a handle may result in ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()