A.substandard ship
B.standard ship
C.over-standard ship
D.reference ship
您可能感興趣的試卷
你可能感興趣的試題
A.The overall condition of the bearing surface should be examined
B.The shaft liner should be inspected for cracks and tested to insure a tight fit
C.The stern tube should be tested for cracks with dye penetrant
D.all of above
A.noting the condition of the fairwater
B.inspection of the keyway
C.logging inspection results in the official deck log
D.all of above
A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosion
B.The stern bearing alignment with the stern frame should be checked
C.The interior of the stern tube should be inspected for leaks
D.The shaft liner should be removed and inspected
A.Mill
B.Float
C.Warding
D.Second cut
A.round out
B.round file
C.reamer
D.hole driller
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The shipboard oil pollution emergency plan will be invalid after ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The treatment of the fuel oils involves storage, heating, filtering and()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If separating effect is not good, which measure should be taken ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()