A.the ISM Code
B.the ISPS Code
C.the IBC Code
D.the IGC Code
您可能感興趣的試卷
你可能感興趣的試題
A.English, French or Spanish
B.Chinese, English or French
C.English, French or Japanese
D.Chinese, English or Spanish
A.six months
B.two years
C.four years
D.five years
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.bridge log
B.Master’s log
C.engine room log
D.oil record book
A.local port authority
B.Corps of Engineers
C.USCoast Guard
D.state pollution board
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
() is not installed on the main switchboar.
The condensers located in various stages of a flash evaporator are cooled by()