A.Baffle plates that have been bent during prior removal
B.Leaks in the cooler tube nest
C.Operating the engine while maintaining a high sea water outlet temperature
D.A punctured sea water strainer supplying cooling water to the heat exchanger
您可能感興趣的試卷
你可能感興趣的試題
A.require no lubrication under normal operating conditions
B.compensate for gross misalignment in the drive train
C.are able to transmit high torque ,even where slight misalignment exists
D.will rapidly disconnect the engine from the line shaft
A.higher raw water temperatures
B.higher jacket water temperatures
C.a malfunctioning thermostat
D.higher fuel temperature
A.camshaft
B.crankshaft
C.governor
D.flywheel
A.Loss of compression for that cylinder
B.Misfiring or rough running
C.Damage to the valve
D.All of the above
A.Air will enter the cooling system
B.Carbon will plug the water cooled exhaust manifolds
C.The jacket water temperature will rise
D.The lube oil viscosity will increase
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Using a file without a handle may result in ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The cetane rating of diesel fuel is an indication of the ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish