A.Inspector general
B.Captain of the port
C.local port authority
D.state pollution board
您可能感興趣的試卷
你可能感興趣的試題
A.expansion space to leave in a tank
B.flash point at which the fuel will burn
C.temperature to which the fuel must be heated
D.rate at which the fuel can be pumped during transfer operations
A.second stage feed heater
B.saltwater feed heater
C.distillate cooler
D.second stage vapor separator
A.spray pipes
B.demisters
C.condensers
D.splash baffles
A.deaerate the first effect distillate
B.filter the condensed flash vapors
C.deaerate the first and second effect distillate
D.remove small water droplets entrained in the flashed vapor
A.vacuum drag from the auxiliary condensate system
B.individual vacuum pumps
C.a single non-condensing air ejector
D.a two stage air ejector
最新試題
Which of the following items don’t belong to dock repair works?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The main purpose of port State control is not to()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Under MARPOL Code the ship to which it applies has to carry ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
() is not installed on the main switchboar.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()