單項(xiàng)選擇題All the damage and shortage,()those incurred after discharge and before delivery to receivers,should be noted in the discharging report.

A.including
B.besides
C.except
D.in addition to


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題A sling is a device used in().

A.hoisting cargo aboard a vessel
B.hoisting personnel aboard a vessel
C.securing a small boat to a large vessel
D.hoisting the anchor

2.單項(xiàng)選擇題A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().

A.slipway
B.graving dock
C.ground warp
D.caisson dock

3.單項(xiàng)選擇題Which action will affect the trim of a vessel? ()

A.Moving high weights lower
B.Adding weight at the tipping center
C.Moving a weight forward
D.Moving lower weight high