A.incorrect electrode setting
B.incorrect nozzle position
C.clogged fuel nozzle
D.broken high tension lead
您可能感興趣的試卷
你可能感興趣的試題
A.relight the boiler immediately to prevent loss of steam pressure
B.relight the fire off the brickwork as the bricks are cherry red
C.purge the furnace of any combustible gases before attempting to relight the fire
D.speed up the feed pump to prevent dry firing when the burner flame is reestablished
A.in the event of a flame failure
B.in the event of a stack fire
C.when the water level reach the crown sheet
D.when the feed pump discharge pressure drops to a preset minimum
A.a burned out solenoid in the oil supply valve
B.high temperature excess air
C.incorrectly setting the hot-well dump valve
D.an incorrectly positioned burner snubber realy
A.clean the flame scanner photocell window
B.Inspect and clean all solenoid valves
C.lift the safety valves by hand
D.Inspect for oil or water leaks
A.cold fuel oil
B.low fuel oil pressure
C.low atomizing steam pressure
D.water in the fuel oil
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The shipboard oil pollution emergency plan will be invalid after ()
Under MARPOL Code the ship to which it applies has to carry ()
The treatment of the fuel oils involves storage, heating, filtering and()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
If separating effect is not good, which measure should be taken ()
Which of the following items don’t belong to dock repair works?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()