A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
您可能感興趣的試卷
你可能感興趣的試題
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
最新試題
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom().
Which method should be used to warm up the pump turbines prior to discharge().
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().
How should you signal the crane operator to move slowly().
Most pedestal crane power is provided by().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
How should you signal the crane operator to hoist().
When using slings,cargo handlers should take all the following precautions except().