A.winch speed
B.boom strength
C.load radius
D.cable strength
您可能感興趣的試卷
你可能感興趣的試題
A.discharging
B.recircling
C.loading
D.taking in
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.Overloading
B.Overstowage
C.Overbooking
D.Overcarriage
最新試題
They()loading at 1400 hours.
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
When viewed from above,the best position for the guy in relation to the boom is().
What is the purpose of the equalizing beam aboard a crane vessel().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
How should you signal the crane operator to lower the boom and raise the load().
Which operation may cause the pressure in an inert tank to fall below the prescribed limits().
What is meant by the term“l(fā)uffing the boom”of a crane().
What does “evel-luffing” accomplish during crane operations().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().