A.it difficult for them to finish the job in time
B.difficult for them to finish the job in time
C.they have much difficulty to finish the job in time
D.that difficult for them to finish the job in time
您可能感興趣的試卷
你可能感興趣的試題
A.bunker fuel for use aboard ship
B.lubricating oil for use aboard ship
C.coconut oil carried in tank vessels
D.oily water from a ships bilges
A.stop bleeding
B.open airway
C.mouth-to-mouth respiration
D.call for help
A.station bill
B.clearance papers
C.certificate of inspection
D.permit to proceed
A.14 percent
B.15 percent
C.16 percent
D.17 percent
A.mineral oil
B.machinery oil being transferred for shipboard use
C.crude oil unrefined
D.normal bilge oil and water
最新試題
The main purpose of port State control is not to()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The ISPS Code consists of a mandatory section-Part A, which shows()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Cold weather starting of a diesel engine may be made easier by()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The treatment of the fuel oils involves storage, heating, filtering and()
Under MARPOL Code the ship to which it applies has to carry ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()