A.paint peeling off the uptake
B.no operation procedures for the oil separators
C.one of ship’s certificates required is invalid
D.damaged sanitary pump
您可能感興趣的試卷
你可能感興趣的試題
A.IOPP
B.type approval certificate
C.cargo ship safety equipment certificate
D.cargo ship safety certificate
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.one year
B.two years
C.four years
D.five years
A.one year
B.two years
C.four years
D.five years
最新試題
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The treatment of the fuel oils involves storage, heating, filtering and()
The condensers located in various stages of a flash evaporator are cooled by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()