A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book
您可能感興趣的試卷
你可能感興趣的試題
A.absence of engine log book
B.serious corrosion on the hull
C.one page missing in the oil record book
D.paint peeling off some tailings in engine rooms
A.paint peeling off the uptake
B.no operation procedures for the oil separators
C.one of ship’s certificates required is invalid
D.damaged sanitary pump
A.IOPP
B.type approval certificate
C.cargo ship safety equipment certificate
D.cargo ship safety certificate
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Cold weather starting of a diesel engine may be made easier by()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The ISPS Code consists of a mandatory section-Part A, which shows()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
To proceed to the assistance of a ship in distress is()