A.the chief engineer
B.the engineer on cabin watch
C.the bridge officer on watch
D.the master
您可能感興趣的試卷
你可能感興趣的試題
A.the chief engineer
B.the engineer on cabin watch
C.the bridge officer on watch
D.the master
A.at anchor
B.at unsheltered anchorage
C.in congested waters
D.in an open road-stead
A.The chief engineer
B.The second engineer
C.The third engineer
D.The fourth engineer
A.The chief engineer
B.The second engineer
C.The third engineer
D.The fourth engineer
A.The chief engineer
B.The second engineer
C.The third engineer
D.The fourth engineer
最新試題
The cetane rating of diesel fuel is an indication of the ()
Which of the following items don’t belong to dock repair works?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
() is not installed on the main switchboar.
The ISPS Code consists of a mandatory section-Part A, which shows()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
If separating effect is not good, which measure should be taken ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()