A.100%
B.1/2
C.1/5
D.1/3
您可能感興趣的試卷
你可能感興趣的試題
A.seal water supply be cut off
B.make up water supply be cut off
C.oil outlet valve closed or not open sufficiently
D.the flow rate of oily water is too much
A.both as clarifiers
B.first one as clarifiers, second one as purifier
C.both as purifiers
D.first one as purifier, second one as clarifier
A.the plant should be prohibited to supplying air
B.the plant should work at intervals
C.the plant should be added disinfector in time
D.we should check strength of activated sludge, ivory-white color is best
A.chlorine water
B.ozone
C.hypo-calcium chloride
D.calcium oxide
A.deposition chamber
B.oxidation pool
C.disinfection chamber
D.all chamber
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
() is not installed on the main switchboar.
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
To proceed to the assistance of a ship in distress is()
The treatment of the fuel oils involves storage, heating, filtering and()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The condensers located in various stages of a flash evaporator are cooled by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.