A.Deck machinery
B.Little power load
C.Some important load
D.stationary submersible pump
您可能感興趣的試卷
你可能感興趣的試題
A.Megohm meter, insulation light and synchroscope
B.Synchroscope, synchro light and megohm meter
C.Shore power switch, insulation light and synchroscope
D.Megohm meter, insulation light and shore power switch
A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane
A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel
A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The condensers located in various stages of a flash evaporator are cooled by()
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.