A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane
您可能感興趣的試卷
你可能感興趣的試題
A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel
A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
To proceed to the assistance of a ship in distress is()
The shipboard oil pollution emergency plan will be invalid after ()
Cold weather starting of a diesel engine may be made easier by()
The condensers located in various stages of a flash evaporator are cooled by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
() is not installed on the main switchboar.