A.first survey and certificate exchange survey
B.first survey and operation survey
C.first survey and periodic survey
D.classification survey and certificate exchange survey
您可能感興趣的試卷
你可能感興趣的試題
A.ship products survey
B.notarization survey
C.ship safety inspection
D.counseling service and publishing ship name list
A.periodic survey
B.statutory survey
C.additional survey
D.annual survey
A.2
B.3
C.4
D.1
A.registry
B.ship hull
C.nationality
D.replacing machineries and electric devices
A.surveyor
B.chief engineer
C.captain
D.chief mate
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Under MARPOL Code the ship to which it applies has to carry ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The cetane rating of diesel fuel is an indication of the ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()