A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
您可能感興趣的試卷
你可能感興趣的試題
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
A.unit method
B.block method
C.straight method
D.package method
最新試題
What type of liquid is used in the liquid P/V breaker().
Which statement is TRUE concerning the gooseneck().
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
The Tally Fees will be settled()my Shipowner()the agents.
The ship will be responsible for the cargo loaded or unloaded().
The foreman says that the stevedores stopped working owing to the()of the winch.
The Captain of the Port has closed to navigation,and buoyed,a section of a harbor. These buoys would be painted().
We’ll adopt the mechanical tallying method().
Please tell your tallymen to()out the marks in the holds during discharging.
Draft readings shall be considered as()in the draft survey report.