A.deck edge immersion
B.the load line
C.downflooding
D.loll
您可能感興趣的試卷
你可能感興趣的試題
A.on
B.in
C.at
D.into
A.Deck area
B.Dining room on board
C.Assembly station
D.Hold
A.adjusting the hose supports
B.laying out an excess length of hose on deck
C.tying off the topping lifts and runners to winch heads
D.All of the above
A.at its goose neck to such a extent
B.at it's goose neck to such an extent
C.at it's goose neck for such a extent
D.at its goose neck to such an extent
A.height
B.breadth
C.depth
D.length
最新試題
The process of lowering a boom to a horizontal position and onto its deck support is called().
The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()
The main advantage and chief characteristic of a Steulchen boom is that it can be().
When a line is spirally coiled about its end and lying flat on deck,it is said to be().
Which mooring line prevents sideways motion of a vessel moored to a pier().
Which type of link is generally used to connect shots of anchor chain().
The tweendecker has()below the main deck.
The terms ceiling and margin plate are associated with the().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().