A.Coast Guard approved
B.stamped with maximum working loads
C.securely fastened
D.positioned exactly at the bow of the towed vessel
您可能感興趣的試卷
你可能感興趣的試題
A.be fitted with a positive fuel shut-off valve located at the tank
B.have a shut-off valve at the top of the tank
C.have a gate valve easily accessible in the space where the tank is located
D.have a drain cock at the lowest point in the fuel line
A.start the mechanical ventilation system for the engine room
B.operate the fuel shut-off for the engine room
C.operate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pump
D.All of the above
A.steel
B.aluminum in an aluminum-hulled vessel
C.schedule 80 fire resistant plastic pipe
D.nickel-copper,copper-nickel or annealed copper
A.used only for pollution response
B.owned and operated by the US government
C.used only within a barge fleeting area
D.used only on inland waters
A.receive a safety orientation or view a videotape before the vessel gets underway
B.view a videotape on safety procedures within 48 hours of reporting for duty
C.receive a safety orientation within 24 hours of reporting for duty
D.none of the above
最新試題
During which condition should the operator of a pedestal crane shutdown operations?()
During storm conditions on a ship,the mooring tensions should be adjusted so that().
During which condition should the operator of a pedestal crane shutdown operations?()
Fire in an engine compartment is best extinguished with carbon dioxide gas (CO2) and by().
Each EPIRB required on an OSV shall be tested using the integrated test circuit and output indicator every().
Fighting a rig fire in the ballast pumproom with hoses would adversely affect the stability of the rig most by().
During the manufacture of line,yarns are twisted together in the().
During the winter months,the southeast trade winds are().
Each life preserver must be readily accessible to the person for whom it is intended while he or she is().