A.comes directly over the bow
B.comes directly over the stern
C.comes over an area extending from broad on the bow to the quarter
D.has no effect on the vessel
您可能感興趣的試卷
你可能感興趣的試題
A.when anchoring in the Mediterranean
B.when docking stern to a berth
C.when docking bow to a berth
D.when anchoring in a strong current
A.loss of maneuverability
B.lines to part
C.damage to the towing vessel and tow
D.a saving in the transit time
A.small plate which fills the aperture between riveted strakes and the vessel framing
B.backing plate which is used to level the strakes while riveting,and then removed
C.internal frame to which the side shell is riveted
D.seam that is welded after riveting is completed
A.matching pulse rates of at least 20 stations
B.an automatic on-and-off switch
C.a horizontal matching of all delayed hyperbolic signals
D.automatic signal acquisition and cycle matching
A.be a stopper
B.shorten a line
C.join lines of equal size
D.keep a line from passing through a sheave
最新試題
A VLCC (100,000 DWT+) with a 30,000 Shaft Horsepower Steam Turbine is slow to respond to engine movements and has less stopping power than normal ships because it has a().
A “spring line” is().
A chart with a natural scale of 1:160,000 is classified as a().
A tonnage tax is levied according to the().
A chain bridle is preferable to a wire rope towing bridle on a long ocean tow because chain().
A crew member reports that the high-pressure alarm light of a low-pressure CO2 fixed fire extinguishing system is illuminated. The most probable cause of this condition would be that().
A “reaching” course is one in which the wind().
A “check” line is().
A “l(fā)iner” in riveted construction of a vessel is a(n)().
A casualty report of an intentional grounding of a ship is required under what condition?()