A.protect (drop packets with unknown source addresses)
B.restrict (increment SecurityViolation counter)
C.shut down (access or trunk port)
D.transition (the access port to a trunking port)
您可能感興趣的試卷
你可能感興趣的試題
A.Test the design on a pilot network for expected results prior to implementing on the production network.
B.Run a network audit to determine types of traffic in use on the network.
C.Launch campus updates into the production network and monitor impact to see if configuration changes are needed.
D.Create an interruption of data flow to determine test "back-door" access methods.
A.a detailed physical and logical topology
B.a cost analysis of the implemented solution
C.detailed logs from the AAA and SNMP servers
D.results from audit testing of the implemented solution
A.having alternative addressing and VLAN schemes
B.having a rollback plan in case of unwanted or unexpected results
C.running a test script against all possible security threats to insure that the solution will mitigate all potential threats
D.isolating and testing each security domain individually to insure that the security design will meet overall requirements when placed into production as an entire system
A.a list of existing network applications currently in use on the network
B.network audit results to uncover any potential security holes
C.a planned Layer 2 design solution
D.a proof-of-concept plan
E.device configuration templates
A.detailed list of personnel assigned to each task within the plan
B.a Layer 2 spanning tree design topology
C.rollback guidelines
D.placing all unused access ports in VLAN 1 to proactively manage port security
E.enabling SNMP access to Cisco Discovery Protocol data for logging and forensic analysis
最新試題
What is the configured priority value of the Vlan105’s group on DS2 ?()
What two things will occur when an edge port receives a BPDU?()
Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()
During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()
During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()
Refer to the exhibit. Based on the output of the show spanning-tree command, which statement is true? ()
Refer to the exhibit. Switch 15 is configured as the root switch for VLAN 10 but not for VLAN 20. If the STP configuration is correct, what will be true about Switch 15?()
Refer to the exhibit. All network links are FastEthernet. Although there is complete connectivity throughout the network, Front Line users have been complaining that they experience slower network performance when accessing the server farm than the Reception office experiences. Based on the exhibit, which two statements are true?()
Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()
Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()