單項(xiàng)選擇題What approximates the signal attenuation of a plasterboard wall?()

A.Crowd of people
B.Office window
C.Metal door
D.Brick wall


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Which statement is true when using a Cisco Wireless Mesh Networking Solution?()

A.The backhaul link is dynamic 1 to 54Mb/s.
B.The backhaul link is typically a fixed value.
C.The backhaul link uses DAS antennas.
D.The backhaul link uses antenna multiplexing.
E.The backhaul link does not rely on fade margin.

2.單項(xiàng)選擇題To which parameter should the access point be set during a site survey?()

A.Transmit only
B.Diversity
C.Receive only
D.Single isolated antenna

4.單項(xiàng)選擇題If there is an existing 802.11g WLAN at a site, which service can be provided without conducting anew site survey?()

A.Add a new 802.11a WLAN
B.Increase the Layer 2 and Layer 3 security of the WLAN
C.Increase the throughput for the wireless clients
D.Add new services (such as voice) over the WLAN

5.多項(xiàng)選擇題What are two objectives of a pre-site survey walkthrough? ()

A.Identify potential problem areas
B.Define intended coverage areas
C.Access compliance with local building codes
D.Determine the final location of APs and antennas
E.Identify sources of RF signal attenuation and RF interference

最新試題

What does a Cisco Unified Wireless IP Phone 7921G deployment require()?

題型:單項(xiàng)選擇題

By how much is a signal’s strength reduced when the signal passes through an object thatintroduces 3 dB of attenuation?()

題型:單項(xiàng)選擇題

When planning for voice deployments with the Cisco Unified Wireless IP Phone 7921G handset in amultifloor building with a WLAN that operates at an 11 MB/s data rate, how many decibelsreferenced to 1 milliwatt of same-channel separation are recommended between floors?()

題型:單項(xiàng)選擇題

Which three colors are used in the Cisco WCS v5.2 Voice Readiness Tool?()

題型:多項(xiàng)選擇題

For an active Cisco Unified Wireless IP Phone 7921G 5 GHz site survey, what are the mostappropriate client test settings to use with the AirMagnet site survey tool?()

題型:單項(xiàng)選擇題

According to the following statement, can you tell me which term is described?()It is the air return for an air conditioned system. In most buildings, the area above a drop ceiling orunder a raised floor is used as the air return (source of air) for the air conditioning. Those dropceiling and raised floors are also where wire is often installed. If wire and cable is installed in a dropceiling or raised floor, it is out of sight. If that cable were burning, it would give off toxic fumes.These would be fed to the rest of the building by the air conditioner. As a result, people could beinjured even though they are a long way from the fire.

題型:單項(xiàng)選擇題

When planning for VoWLAN capacity during a site survey, how many simultaneous calls can beestimated per 5 GHz channel?()

題型:單項(xiàng)選擇題

Which statement regarding the site-survey process is correct?()

題型:單項(xiàng)選擇題

In an outdoor bridge link, what is calculated by using this formula: transmitter power + antennagain - insertion OR cable loss()?

題型:單項(xiàng)選擇題

Which can NOT be selected for supported services in Cisco WCS Planning Tool?()

題型:單項(xiàng)選擇題