In project management, a ( )is a list of a project’s milestones, activities, and deliverables, usually with intended start and finish date. Those items are often estimated in terms of resource allocation, budget and duration, linked by dependencies and scheduled events.
A. schedule
B. WBS
C. SOW
D. charter
( )can be considered as part of risk mitigation.
A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities
( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results
The length of the IPv6 address is ( ).
A. 64 bytes
B. 128 bytes
C. 64 bits
D. 128 bits
A ( )is a software that provides a method of communication between two electronic devices over the World Wide Web.
A. router
B. cober
C. J2EE
D. web service
最新試題
你是收款機系統(tǒng)的項目經(jīng)理,你公司為零售業(yè)生產(chǎn)收款和系統(tǒng)軟件。你客戶提出了一個改變收款機系統(tǒng)特征的變更要求。你運用了綜合變更控制過程的哪個工具和技術(shù)來描述了收款機系統(tǒng)的特征?()
你是一位來自美國的國際項目經(jīng)理,居住在外國,你所從事的項目已持續(xù)了2年半。在這期間,你已經(jīng)完全適應(yīng)了所在國家的生活,并且習(xí)慣了他們的文化。項目剛剛結(jié)束,你返回了美國。當(dāng)你返家時,你驚訝的發(fā)現(xiàn)自己的感覺有點迷茫,因為你已經(jīng)習(xí)慣了國外的文化以及她慢節(jié)奏的生活,以至于忘記了美國是個什么樣子。這種經(jīng)歷被認(rèn)為是:()
以下哪項描述了項目執(zhí)行和控制過程的獨特特征?()
某項目經(jīng)理剛被聘用,并設(shè)法與他人的合作。在這種狀態(tài)下,他要采用哪種最佳的權(quán)利方式來獲得合作?()
一位承包商簽署了一份固定金額的正式書面合同,承建一幢辦公大樓。當(dāng)承包商開始實地工作時,他發(fā)現(xiàn)實際用時與用料都要超過他在投標(biāo)中包括的工時與材料。承包商告訴客戶,他要么擁有更多資金,要么就拒絕完成項目。承包商可以這么做嗎?()
談判的根本目標(biāo)是()
你是一家非盈利組織的項目經(jīng)理。你的項目是由社會需求所產(chǎn)生的。你的贊助商希望馬上進(jìn)入規(guī)劃過程。然而,你知道在進(jìn)行規(guī)劃過程之前必須公布項目章程。對于項目章程,以下哪個說法不屬實:()
開發(fā)過程的調(diào)整和優(yōu)化發(fā)生在質(zhì)量管理的哪個階段:()
下圖的項目費用控制圖,表示在第5個月項目處于什么狀態(tài):()
你是美國國旗公司的項目經(jīng)理,公司設(shè)計了一條美國特征的國旗生產(chǎn)線。由于一些特殊的情況,該產(chǎn)品的需求很熱,項目贊助商要求你盡快完成項目及交付產(chǎn)品。你決定刪除一些非關(guān)鍵要求,增加項目資源。由于時間是目前的一個關(guān)鍵因素,所以贊助商同意支付額外的費用。你使用了以下哪種技術(shù)?()