A.Lashing system
B.Stacking system
C.Locking system
D.Buttress system
您可能感興趣的試卷
你可能感興趣的試題
A.Ties a container stack to the deck
B.Ties a container to the container below it
C.Restrains racking loads
D.Restrains the container against horizontal motion
A.Stack weights should be less when using a solid bar lashing as compared to a wire lashing
B.Stack heights may be increased when using a solid bar lashing
C.Stack heights should be reduced when using a solid bar lashing
D.Solid bars should be used for lashing the first tier only,with wire lashings on the higher tier(s)
A.on the bottom tier on deck
B.in the hold
C.next to the buttress tower
D.on the top tier
最新試題
The fittings used to secure a watertight door are known as().
Limber is a term associated with().
If the goods shipped are perishable,low cost goods,live animals,deck cargo,etc.,the freight and all related charges shall be paid().
The most common method of securing a line to a cleat is a().
Placing a lashing across a hook to prevent a fitting from slipping out of the hook is called ().
The lashings of a stack of containers with interlocking fittings restrain the forces that cause().
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
If your vessel has a list to port due to negative GM and off-center weight,the first corrective measure you should take is to().
In order to help protect a natural fiber rope from rotting,the line must be().
An advantage of nylon rope over manila rope is that nylon rope().