A.can be used in conjunction with wire or spring-lay rope
B.can be stored on decks exposed to sunlight
C.can hold a load even when a considerable amount of the yarns have been abraded
D.gives audible warning of overstress whereas manila does not
您可能感興趣的試卷
你可能感興趣的試題
A.date of the test
B.load at which a test sample broke
C.name of the vessel
D.number of strands and of wires in each strand
A.stackers
B.twistlock
C.bridge fittings
D.containment booms
A.a bulge in the wire where the strain occurred
B.a decrease in diameter where the strain occurred
C.a kink in the wire where the strain occurred
D.no visible effects of an overstrain
A.breakout wrench
B.makeup tongs
C.chain tongs
D.pipe spinner
A.the vessel has enough room to swing while at anchor
B.the anchor flukes bite into the ocean bottom
C.there is sufficient weight from the anchor and chain to prevent dragging
D.there is more chain out than there is in the chain locker
最新試題
The freight will not be payable()the goods are delivered in such a condition that they are substantially and in a mercantile sense the same goods as those shipped.
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
In the stowage of deck cargo,cribbing is().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
The shippers to load trucks and heavy cargo,and also to supply all necessary materials for lashing.The expenses will be charged to()account.
The fittings used to secure a watertight door are known as().
A wire rope that has been overstrained will show().
A sufficient amount of chain must be veered when anchoring a vessel to ensure().
Nylon line is NOT suitable for().
If your vessel has a list to port due to negative GM and off-center weight,the first corrective measure you should take is to().