A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
您可能感興趣的試卷
你可能感興趣的試題
A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
A.Security level 1
B.Security level 2
C.Security level 3
D.Highest safety level
A.Security level 1
B.Security level 2
C.Security level 3
D.Medium safe level
A.Security level 1
B.Security level 2
C.Security level 3
D.Lowest safety level
最新試題
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
() is not installed on the main switchboar.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Under MARPOL Code the ship to which it applies has to carry ()
Cold weather starting of a diesel engine may be made easier by()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Diesel engine air start system check valves are opened by ()
The ISPS Code consists of a mandatory section-Part A, which shows()
The treatment of the fuel oils involves storage, heating, filtering and()