A.vent line
B.overflow line
C.feed line
D.sounding tube
您可能感興趣的試卷
你可能感興趣的試題
A.Holding the valve open for a long period
B.Increasing the starting air pressure used
C.Opening the stating air valve quickly
D.Reducing the starting air valve size
A.corrosion fretting
B.insufficient lubrication
C.abnormal wear
D.fatigue failure
A.sludge
B.water
C.micro-organism growth
D.all of the above
A.burned exhaust valves
B.excessive spring compression
C.spring surge
D.worn valve seats
A.worn valve seats
B.worn main bearing
C.excessive valve clearance
D.weak rocker arm springs
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The condensers located in various stages of a flash evaporator are cooled by()
Diesel engine air start system check valves are opened by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
To proceed to the assistance of a ship in distress is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The main purpose of port State control is not to()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
() is not installed on the main switchboar.