A.advance freight
B.back freight
C.dead freight
D.pro rata freight
您可能感興趣的試卷
你可能感興趣的試題
A.Guy failures
B.Topping lift failures
C.Bending of the boom from compression
D.Gooseneck failure
A.is capable of bringing
B.is sufficient to bring
C.is not capable of bringing
D.is probally to bring
A.ships arrive at random
B.cargo-handling time varies greatly
C.ships have to queue to get onto berths
D.ships do not have to wait to get onto berths
A.breakdown
B.breaked down
C.broken down
D.broke down
A.decelerating when lowering the load
B.decelerating when raising the load
C.lowering the load at constant speed
D.raising the load at constant speed
最新試題
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
Due to the shape of the(),whereby forward- and aft ship are differently shaped,a trim correction on the draft measurement has to be done.
The Captain of the Port has closed to navigation,and buoyed,a section of a harbor. These buoys would be painted().
Preventer bars are fitted on lifeboat releasing hooks to prevent().
The cargo is liable to burn.Please keep it()the engine room.
Which statement is TRUE concerning the gooseneck().
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().
Which cargo is considered volatile().
Red lights may appear on().
Please tell your tallymen to()out the marks in the holds during discharging.