A.Bunker C
B.Turkey-red oil
C.Sweet oil
D.Iso-Propylamine
您可能感興趣的試卷
你可能感興趣的試題
A.Contain the oil and remove as much of it as possible from the water
B.Throw chemical agents on the water to disperse the oil
C.Throw sand on the water to sink the oil
D.Obtain your permit from the Corps of Engineers
A.unit method
B.block method
C.straight method
D.package method
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
最新試題
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
The foreman says that the stevedores stopped working owing to the()of the winch.
The cargo,when(),should be completely covered with plastic.
Draft readings shall be considered as()in the draft survey report.
When oil is accidentally discharged into the water,what should you do after reporting the discharge().
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
Please don’t change the cargo plan()will.
We’ll adopt the mechanical tallying method().
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
The ship will be responsible for the cargo loaded or unloaded().