單項選擇題Stress on the topping lift of a swinging boom can be reduced by().

A.rigging a back stay
B.raising the boom
C.increasing the mechanical advantage of the cargo purchase
D.taking all slack out of the preventer


您可能感興趣的試卷

你可能感興趣的試題

3.單項選擇題Roll-on/roll-off ships are equipped with().

A.cargo elevators
B.conveyor belts
C.ramps
D.derricks and winches for cargo handling

5.單項選擇題Please stow the drums()ends.

A.at
B.in
C.on
D.by