單項選擇題There is a danger of the starting current that the windings are burnt out()

A.to increase
B.to be so increased
C.increased
D.being so increased


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題I find ()

A.it difficult for them to finish the job in time
B.difficult for them to finish the job in time
C.they have much difficulty to finish the job in time
D.that difficult for them to finish the job in time

2.單項選擇題The pollution prevention regulations do not apply to the transfer or discharge of ()

A.bunker fuel for use aboard ship
B.lubricating oil for use aboard ship
C.coconut oil carried in tank vessels
D.oily water from a ships bilges

3.單項選擇題The first step you would take in helping an unconscious victim who is not breathing is()

A.stop bleeding
B.open airway
C.mouth-to-mouth respiration
D.call for help

4.單項選擇題Your assigned emergency station aboard ship can be found on the ship’s ()

A.station bill
B.clearance papers
C.certificate of inspection
D.permit to proceed

5.單項選擇題The minimum amount of oxygen required to support life is()

A.14 percent
B.15 percent
C.16 percent
D.17 percent

最新試題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:單項選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:單項選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:單項選擇題

Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()

題型:單項選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:單項選擇題

() is not installed on the main switchboar.

題型:單項選擇題

Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()

題型:單項選擇題

The condensers located in various stages of a flash evaporator are cooled by()

題型:單項選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項選擇題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:單項選擇題