A.the chief engineer
B.the master
C.the bridge
D.the company superintendent
您可能感興趣的試卷
你可能感興趣的試題
A.the running hours of the cooling water pump
B.chief engineer’s order
C.the main parameters of main and auxiliary equipment
D.the position of the vessel
A.made and noted as required by the duty engineer
B.reported to chief engineer immediately after being made by duty engineer
C.never made before getting permission from chief engineer
D.made as required but not logged
A.the main propulsion plant
B.lifesaving jackets
C.lifeboat engine
D.state of emergency generator
A.the common ground point
B.the starter’s frame
C.the commutator
D.the starter’s mounting bolts
A.flame retardant
B.moisture resistant
C.oil resistant
D.low conductivity
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Using a file without a handle may result in ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which of the following items don’t belong to dock repair works?()
The condensers located in various stages of a flash evaporator are cooled by()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Diesel engine air start system check valves are opened by ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()