A.shut off the starting air receiver outlet valve
B.stop the FO priming transfer pump and shut off the correspondence inlet and outlet valve
C.stop the SW pump immediately and shut off the correspondence inlet and outlet valve
D.stop the FW pump immediately and shut off the correspondence inlet and outlet valve
您可能感興趣的試卷
你可能感興趣的試題
A.overload
B.the odds of the load
C.the default of parts
D.overload and the odds of the load
A.testing for the mechanical load and the thermal load
B.inspecting thermal and mechanical condition of the engine
C.inspecting each system and exhaust temperature
D.testing for compress pressure and explosion pressure
A.the highest
B.above 3/4
C.1/2-3/4
D.the lowest
A.achromatism or thin gray
B.thin white
C.sky-blue
D.black
A.notify the duty officer, reduce the engine speed, take some measures to remove failures
B.notify the duty officer and stop the engine immediately, find the cause and remove failures
C.notify the C/E
D.notify the captain
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which of the following items don’t belong to dock repair works?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()