A.chief engineer
B.the engineer
C.captain
D.any member of the engine department
您可能感興趣的試卷
你可能感興趣的試題
A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the SW valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock
最新試題
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Under MARPOL Code the ship to which it applies has to carry ()
The main purpose of port State control is not to()
The shipboard oil pollution emergency plan will be invalid after ()
Which of the following items don’t belong to dock repair works?()