A.chief engineer
B.surveyor
C.the engineer
D.the technique personnel of the shipyard
您可能感興趣的試卷
你可能感興趣的試題
A.chief engineer
B.the engineer
C.captain
D.any member of the engine department
A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
最新試題
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The treatment of the fuel oils involves storage, heating, filtering and()
Under MARPOL Code the ship to which it applies has to carry ()
Using a file without a handle may result in ()
The main purpose of port State control is not to()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
To proceed to the assistance of a ship in distress is()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Flame failure in an automatically fired auxiliary boiler can from a/an ()