A.send a requisition list to the supplier
B.check that whether the items ordered have been already delivered
C.make the chief engineer on sport
D.follow a preset procedure
您可能感興趣的試卷
你可能感興趣的試題
A.make clear of your authority
B.make friends with ships crew
C.call the first engineer if there is a problem
D.call the master if there is a problem
A.Chief engineer
B.Second engineer
C.Master
A.All scuppers plugged by carpenter
B.Tanks sounded from time to time
C.Watch kept for leakage
D.Take oil samples
A.When to bunker?
B.Type of FO
C.Pollution prevention measures
D.Engineer to be responsible for
A.It’s important to make clear the chain of command within the vessel
B.It is primarily your own responsibility to look after your person safety
C.The porthole is the first choice to escape when in emergency
D.all cabins are fitted with a Survival at Sea Manual
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The ISPS Code consists of a mandatory section-Part A, which shows()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Which of the following items don’t belong to dock repair works?()
() is not installed on the main switchboar.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()