A.increasing the shaft RPM prior to release
B.using a pelican hook for quick release
C.using preventers
D.using a short chain for the lead through the stern chock
您可能感興趣的試卷
你可能感興趣的試題
A.5 times the depth of the water in good holding ground
B.10 times the depth of the water in shallow water
C.2 times the depth of the water in poor holding ground
D.8 times the depth of the water in deep water
A.coil it counterclockwise
B.not coil it
C.take a turn under
D.twist out the kinks under a strain
A.when the line pull reaches the rated winch capacity
B.after the line pull exceeds the rated winch capacity
C.after a short build-up of torque
D.immediately
A.anchoring
B.mooring
C.sewing
D.splicing
A.cargo runners
B.stays
C.topping lifts
D.All of the above
最新試題
The purpose of a devil’s claw is to().
The only wire rope termination which may be made in the field is().
At the instant when a string of casing being run from a ship is landed in the well head,().
In securing a towing cable,consideration must be given to letting go in an emergency. The possible whip of towlines when released can be overcome by().
Cribbing is().
The standing part of a tackle is().
Compared to manila line,size for size,nylon line().
A splice that can be used in running rigging,where the line will pass through blocks,is a().
Chafing gear is normally used().
The square knot is used for().